The newly-constructed hospital and medical office building is a state-of-the-art acute care facility that includes 155 patient suites, an emergency department, ICU, five operating rooms, a Labor and Delivery unit, and a full cath lab with two intervention procedure rooms. As the technology integrator, The Mohr Group touched every room in the facility and collaborated with the design professionals and construction trades to ensure these critical workspaces were properly equipped.
“The sensitive nature of healthcare IT demands a higher level of skill and agility. Our team rose to the occasion and delivered a white glove service to the client. By customizing our approach and tools, we separated ourselves and became much more than an integrator”, said Steve Mohr, Principal Consultant of The Mohr Group.
Scopes of work managed by The Mohr Group included but was not limited to the following:
Full-Service Project Management and IT Integration, including imaging and installation services for patient and staff technology:
- Hardware logistics
- Inventory tracking
- Staging of equipment
- Patching of all technology in the IDFs as well as on the device side
- Documentation of all network connections
- Switch rack and stack
- Imaging of desktop computers
- Base configuration and updates on devices
- Technology installation, validation
Day One Support Technology includes:
- Switches
- Access Points
- Room link devices
- All-in-one devices
- Desktops
- Smart boards
- TVs
- WOWs
- Signature pads
- Scanners and printers
- Conference phones
- Media walls
- Construction PM
- Electricians
- Low Voltage Vendors
- Medical Vendors including
- Cerner
- Sonitor
- Telephony
- Weekly delivery of status reports and IT punch list items to keep all teams in sync
- Delivery of documentation upon completion of project including
- Port and networking information
- Inventory tracking
- Technology deployment document