The Mohr Group was excited to return to a Hospital ICU Vertical Expansion Project in order to help bring it to a successful conclusion.
This expansion, which began at the end of 2020, has added multiple new floors to the existing ICU building, providing additional space for patient rooms and state-of-the-art medical equipment.
The last patient floor built in the expansion includes 25 patient rooms, multiple private and shared offices, a large centrally located nurse station, and nurse charting stations between each patient room. The floor also features workstations in a large common area, making it easy for medical staff to access electronic records and information. A physical therapy room is also included on the floor.
The Mohr Group was instrumental in providing the IT integration needed to ensure the best possible care for patients.
They worked closely with other vendors, project managers, and staff to provide a complete and cohesive finish to the expansion project. They are now excited to return to the hospital to provide Day 1 support, ensuring a smooth transition into patient care. The Mohr Group is committed to providing the highest quality of care for patients and look forward to continuing to support the hospital in its expansion efforts.
“It was such a great privilege to lead this project. There’s always a tremendous feeling of fulfillment when we know that the work we do is impacting the community in a positive way”, states Jeffrey Poggio, Implementation & Design Lead for The Mohr Group.
Full-Service Project Management and IT Integration, including installation and validation services for patient and staff technology:
- Hardware logistics
- Inventory tracking
- Staging of equipment
- Patching of all technology in the
- IDFs as well as on the device side
- Documentation of all network connections
- Switch rack and stack
- Base configuration and updates on devices
- Technology installation